According to the calculating, the space required for on day’s production is around 200sqm, following sufficient air curing, the green building units are removed from the pallets to the next day, calculation of the total curingarea:200×1.5=300 sqm,workshop area for machine is around 250 sqm,total shaded area is around 550 sqm,Forstocking yard the requiredarea is around 2000 sqm( based on 28 days production)Note: land area mentioned includeds the area for raw material assembly, workshop, officeand assembly yard for complete products. we will ask for a map of customer's land dimension, then we will design a customized factory layout and make best use of your land.


A simple block making production line in the picture requires approximately 12-15 manual labors and 2 supervisors ( to operate the machine needs 5-6 employees)

One operator for batching station and mixer

One operator for block machine

2 operators for feeding pallets to the machine

1-2 operator for forklift

3D Simple production line.jpg


1.PL1200 batching station 2.JS500 Mixer 3.Cement silo 4.screw conveyor
5.Cement scale 6.Conveyor belt 7.block machine 8.Automatic stacker


www,unikblockmachine.com




Subscribe to our email list
Sign up with your name and email to get the latest proway updates, exclusive access to promotions, sales events, pre-order sales & more!
Connect with Unik
Become our fan, follow us & subscribe for the latest updates and deals
Iink01 Iink02 Iink03 Iink04 Iink05 Iink07 Iink08 Iink09
QR Code QR Code
  • About Us
  • bd电子app官方登录
  • News
  • bdapp手机端下载网址
  • Service&Support
  • bd官方网址下载
  • Contact Us
  • Showroom
  • bd网页登录版登入
  • Sitemap
  • bdapp官方下载安卓版批发
    Baidu
    map